Allegheny County lists Monday, November 30, as the start of new construction on Jacks Run Bridge No. 3 in Ross Township. The bridge carried Jacks Run Road over I-279. Jacks Run Road remains closed between Bellevue Road and Bellpark Drive at one end and Kane Lane at the other. The county estimates construction will finish in December 2027. County project schedule and closure map
How to get around the Jacks Run Road closure
Heading south toward Brighton Road, continue from Bellevue Road onto North Balph Avenue. Turn left onto Lincoln Avenue, then left onto Brighton Road. Turn left onto Jacks Run Road if your destination is on that side of the closure. Reverse the route when heading north toward Bellevue Road. Check the county map if you are trying to reach a driveway or side street near either closure point. Official detour map and directions
What the replacement is expected to cost
The county project page lists Swank Construction Company as the main contractor and estimates $5.9 million for new bridge construction. It lists demolition separately at