Pittsburgh’s Historic Review Commission is scheduled to consider updated design guidelines for Manchester, Mexican War Streets and the Mexican War Streets Expansion Historic District on Wednesday, December 2. The revised agenda puts possible adoption under Hearing and Action. The meeting starts at 2 p.m. Eastern. A decision remains pending.
What property owners should look for
The agenda pairs the updated guidelines with what it calls a hierarchy of facades. Pittsburgh’s general historic district guidelines describe how visibility from a street or sidewalk bears on review of exterior changes. A front wall, a side wall that faces a street and a less visible rear elevation can raise different questions. The December 2 meeting page posts separate documents for each district.
If you are planning exterior work, start with your street address, the part of the building you intend to alter and whether it faces or can be seen from a public street. The agenda lists separate documents for the original Mexican War Streets district and its expansion district. Ask City Planning which district and version apply before using a document from the meeting packet to plan work. After the meeting, look for an adopted text and any effective date.
The Manchester and Mexican War Streets drafts both emphasize exterior work visible from a public street or sidewalk. Before preparing plans for a side wall or roof, use the city’s historic districts and facade maps to check the parcel and elevation, then confirm the classification with City Planning. The meeting page links to the district-specific drafts under Presentations.
How to start a certificate application
The city’s Certificate of Appropriateness process guide directs applicants to review their district guidelines and submit through OneStopPGH. Prepare photographs of the existing conditions, proposed materials and drawings as applicable. Staff check whether the application is complete and determine whether it can be reviewed administratively or goes to the commission. The city lists exterior repairs that keep material, shape and finish unchanged as examples of work typically eligible for administrative review.
Three individual applications are on the agenda
- 1222 Palo Alto Street, BDA-2026-09573. The window replacement application is in the Mexican War Streets Historic District.
- 1321 Reddour Street, BDA-2026-09562. The application proposes rooftop solar panels in the Mexican War Streets Expansion Historic District. The commission’s action will establish whether it approves this installation and whether any conditions apply.
- 2018 East Carson Street, BDA-2025-00898. The facade renovation packet includes a proposal for aluminum-clad wood windows installed behind the existing exterior window trim. The case is in the East Carson Street Historic District on the South Side.
The meeting page links to presentations for each property. Those applications seek certificates of appropriateness for the work at their respective addresses. The proposed guidelines are a separate action covering three districts. A decision on a window, solar installation or facade project would apply to the case before the commission. Check the case number when looking for any conditions in the decision.
How to attend, watch or comment
Attend in the lower-level hearing room at 412 Boulevard of the Allies or join via the Zoom link in the revised agenda. The city also directs viewers to the City Planning YouTube channel. Speakers joining by Zoom can use the raise-hand button. The agenda gives telephone participants the option to press *9 to request to speak.
Email testimony on hearing-and-action items is due at noon Eastern Tuesday, December 1, at historicpreservation@pittsburghpa.gov. Identify the case number or district guidelines you are addressing. The Wire’s City Planning participation FAQ explains how to find the right board and agenda.
What comes after the meeting
Look for a recorded action on the guidelines and a separate disposition for each property application. If commissioners ask for revisions or defer an item, the next agenda and revised documents will show when it returns and whether the proposal has changed.